Off to a wet start
So the April Showers arrived – slowed everything down so far as barn building went.
The gravel base has been delivered and the framing materials are ready to come off the trailer.

The Corner is Set in Place
Corner posts were set and checked for square and vertical.

East End Wall Posts
The rest of the posts were set for the walls. Side girts were added, then the posts trimmed off to the correct height. Top plate and top girts were added.

Purlins Added

Framed

Ready for Concrete
Half the barn to get concrete floor.

Rodding off the pour.

Floating the Concrete

Sheet Metal Roofing Added

Siding on South Side

Covered
So next up is to install the trim under the eaves and around the doors. Later on I’ll add a concrete floor to remaining half and add the doors.